PROJECT 4
Project: basement walkout construction
Number of steps: 10
Project duration: 3 days
The customer in this project needed a basement walkout. So, we started from making wood frames, then prepared a concrete mix and poured it into the frames. After the concrete had hardened, we removed the frames and as a final step we shaped the surface of each of the steps. The owner was extremely satisfied with the quality of the walkout and was able to rent out the basement.